Friday, 6 December 2013

QSB2514 - Construction Technology 3

Lecturer : Mr. Chiew Seng Khoon

In this sem3 QSB2514 - Construction Technology 3 I have learnt a lot of knowledge. First of all is the IBS system stand for Industrialised Building System. In system , We learnt tunnel form work, aluminium form work, retaining walls and others. In theory Mr chiew teaches us about this all the process and components of the all system.

However there is a different between the theory and the actual site situation. We found out that the actual site situation are not following some procedures. Beside that, the most important thing is we learn about the teamwork between each others of the group members. I found out that, it is important to work well between group member to achieve quality and efficient work.

In this Semester my case study is Prestress concrete. We have been doing a lot of reseach on this chapter and we found out that it is not that easy to form a prestress concrete. To form a prestress concrete need to have a lot of step. Prestress concrete have the advantages in prevent cracking, to overcome load problem and save cost.

This is the photo we taken from actual site 





No comments:

Post a Comment