Wednesday, 10 July 2013

QSB 1813 - Site surveying

In Site Surverying I have learnt the leveling theory and practice. In theory of leveling  we learnt What is bench-marks , temporary benchmark, Reduced level, Backsight, Foresight, intermediate sight, change point and Line of collimation. Those are the term we know to learn before to calculate.


Remarks
Backsight
Intersight
Foresight
Rise
Fall
Reduce Level
Bm1
114




100
A
133

131

17
83
TP1
132.5

135

2
81
Ramp 1
374.5

133.5

1
80
Tp2
123

136
238.5

318.5
B
136

123.5

0.5
318
C
138

137

1
317
TP3
48

139

1
316
Ramp 2

61.5


13.5
302.5
TP4
107

258

196.5
106
D
110.5

126

19
87
TP5
132

130

19.5
67.5
BM1


116
16

83.5
1548.5
1565
254.5
271
                There is 2 method in calculate levelling which is ‘’Rise and Fall’’ and ‘’HI’’ method.

Example of Rise and Fall method




Besides that, we also learnt how to make correction of misclosure
Remarks
Reduce Level
Correction
Adjusted Reduce Level
Bm1
100
0
100
A
83
1.5
84.5
TP1
81
3
84
Ramp 1
80
4.5
84.5
Tp2
318.5
6
324.5
B
318
7.5
325.5
C
317
9
326
TP3
316
10.5
326.5
Ramp 2
302.5
12
314.5
TP4
106
12
118
D
87
13.5
100.5
TP5
67.5
15
82.5
BM1
83.5
16.5
100

This is one of the example of Misclosure Table.















We also learnt what is the required equipment for Levelling. A levelling staff , tripod, auto level meter, staff bubble.






This is our first pratical in Taylor University. We are learning on how to use the auto level meter to measure the BS, IS and FS.













Beside that’s we also learn practical and Theory of traversing. In theory, the equipment of traversing is the almost the same as levelling just the levelling staff changed to rod staff. Traversing is using the azimuth and bearing to calculate.

The following is the examples of our Practical field work
Station
Angle Measured
A
75°
B
70°
C
117°
D
98°

Points
Distances
Azimuth
Bearing
Latitude
Departure
DA
8.4
98°
S 82° E
-1.169
8.318
AB
12.9
353°
N 7° W
12.804
-1.572
BC
7.58
243°
S 63° W
-3.441
-6.754
CD
7.55
180°
0
-7.55
0
∑=36.43
∑=0.644
∑=-0.008






Points
Correction to Latitude
Corrected Latitude
Correction to Departure
Corrected Departure
Coordinates
Coordinates
DA
-0.147
-1.316
0.00184
8.32
100mN
100mE
AB
-0.228
12.576
0.00285
-1.57
98.683mN
108.32mE
BC
-0.133
-3.574
0.00166
-6.752
111.259mN
106.750mE
CD
-0.132
-7.686
0.00166
0.002
107.684mN
99.998mE


No comments:

Post a Comment