Wednesday, 10 July 2013

QSB1524 - Construction technology 2


                In Constuction technology 2, I learn about the Pile foundation. For examples soldier piles and laggings, contiguous bored pile and basement diaphragm walls. Every piles excavation required a temporary support and maybe need additional support depand on situation.
                
In my Assignment we choose Scaffolding topic as our case study. We have visit 2 place one is at Ara Damansara, Petaling Jaya and One more is at The site Near Taylor University.

This is our 1st site, which is located at Ara Damansara, Petaling Jaya, Selangor. The title of the project is ‘’CADANGAN PEMBANGUNAN PERNIAGAAN’’

This is the Sleeve coupler and it is used for connecting the steel scaffolding pipe or other similar pipe.
This is the Main frame of a scaffolding and it is one of the components of scaffolding. In order to make a frame scaffolding 2 main frame is required.
This is scahe platform and the green net is called as netting to prevent thing from dropping down and prevent the dust from going out from the building.
This is the U-Head jack and the main function is to hold timber beam in securely in place or help to support the weight of the suspended slab.
This is a base plate which connected with the main frame and help to transfer the load to the ground. The base plate also can help to adjust the frame scaffolding into a require height when there is a uneven ground.


 This is the cross brace which connected with diagonally to the  both side of main frame. Cross brace is used stabilize the frame scaffolding, in other word is to support the main frame scaffolding.
This is the Frame scaffolding with all the components are connect with each others. The function is to transfer the load from the upper to the ground and provide a safe place of work with safe access suitable for work being done.
This is a joint pin it is used to put between of the two scaffolding and it function is to connect the upper and lower scaffolding together.
 This is Follow section which place under the suspended slab formwork.
The Follow section help to spread the weight of the upper floor to the scaffolding. Follow section also can be a timber but in this site they use metal as a follow section.
 This is a crossbreed. It function is to Stabilize the scaffolding. It is required to put on both side of the main frame and this crossbreed required to every 3 scaffolding.

2nd site
This is a scaffolding walking board which allow the workers to walk and work on the scaffolding.
This is the save passage way for the worker to walk through it is one of the safety rule required.
This is a wall tides which tide the wall together with the scaffolding to prevent the scaffolding from collapse.
The green colour net is called as netting the purpose is to prevent the dust or object from going out from the building
This is another type of shorter frame scaffolding basically it have the same function as the longer type of frame scaffolding
Jack base used as a handrail to act as a temporary Staircase handrail.
This is the passenger hoist it can transfer the worker from floor to floor just in few second time.